Projects

Nyingchi Tibet HZS120*2

2020-23-04

In June 2015,Nyingchi Tibet, at an altitude of 3700 meters, our HZS120*2 concrete batching plant put into operation officially from Lhasa to Nyingchi section of Sichuan-Tibet railway.

During the construction, JiuFang Group staff overcame altitude sickness, overcame harsh environment of wind and sand, also overcame the greatly reduced sensitivity of the equipment in the altitude hypoxia environment and other disadvantages. With excellent technology and reliable equipment quality, we earned our customer No.18 bureau of China railway’s respect .As of August,2018,the equipment run perfectly for more than 3 years, and did receive any complaints from No.18 bureau of China railway customer. It clearly shows that no matter how harsh the construction environment is, the professionalism of service personnel and the reliability of the equipment of JiuFang Group is always the benchmark of China’s concrete equipment.

Stationary Concrete Batching Plant HZS120
Prev:Kohara hydropower project in Pakistan Next:HZS120 for China-luang braban railway line in Laos